Category: EV Charging Installation
Client: Goodman Fielder
Custom Electrical was selected to install this 150kW Hyper Charger located in a Goodman Fielder Property in Manukau.
The Hyper charger is capable of:
- Charging most EVs from 0% – 80% within 38 minutes.
- Simultaneously charging of two vehicles at once.
- Has a credit card option for charging clients if required.
A separate switchboard and power supply was required from the network for this installation.
A Hiab was also required to lift the hyper charger into position.