Gilmours Manukau

Handover Date: May 2020
Type: Supermarket Extension Renovation
Category: Construction
Engineer: Cosgroves
Client: Lanskey Construction
Requirements: Electrical, Structured Cabling, Transformer and mains supply upgrade, Electrical Audit on the mains power supply.

We were engaged by Gilmours and Foodstuffs to carry out this project. We logged the incoming power supply and provide reports for the engineers with recommendations for overall power requirements for the site. We arranged for Vector to supply a larger transformer and then installed the new 600A main cable to site. Upgraded the main distribution board and supplied four sub boards. This project included a PS1 design for cable tray install and emergency lighting. We added an office block and large chilled storerooms. Structured cabling included fibre optic cabling and the supply of a 20-year warranty on cabling and design. Custom Electrical acted as an essential service working through level four lockdown to ensure the project was completed by the deadline.